A customer owned a fleet of decanter control panels that were difficult to troubleshoot and were experiencing an accelerated rate of failures.
ICS was asked to develop a plan to upgrade control panels at a minimal cost by reusing their existing control cabinet and framework. Customer wanted to use hardware common to their existing fleet to help reduce cost of ownership.


A custom problem required a custom solution. In this project ICS: